Free Tool for Stone Fabricators
Know What’s Left
After the Job Is Done
Material is only part of the cost. Add your labor, installation, and overhead to see what a countertop job could actually earn.
Job Details
After discounts, before sales tax.
Include assigned waste and freight.
Labor & Installation
Total person-hours × loaded hourly cost. Include templating and travel time.
Other Costs & Overhead
Consumables, delivery, subcontractors.
This job’s share of shop overhead.
Count each cost once. Exclude overhead already in your rates.
%
Your own goal. Margin = profit ÷ selling price.
Where Your Quote Goes
Estimated Job Profit$2,35532.7% margin
Total Job Cost$4,845
Selling Price$7,200
Markup on Cost48.6%
Your Target Is Covered
32.7%0%Target: 30%60%
Price for a 30% Margin$6,921.43
$278.57 above the price needed for your target.
After entered costs and overhead, before income tax. Missing costs reduce profit.
Free CSV report. No email required.