Free Tool for Stone Fabricators

What Should You Charge per Square Foot?

Enter your slab cost, waste, labor, edges, cutouts and overhead. The calculator shows your cost per square foot and the price that gives the margin you want.

Job Details

These are example numbers for illustration, not benchmarks. Replace them with your shop's own.

Material

Usable sq ft is the slab area you can use before this job's layout waste; a loss already taken off it does not go in waste again. Waste is the share of the slab this job does not use. Material cost = job sq ft ÷ (1 − waste) × cost per slab sq ft. It shares out the slab cost by area; it does not plan cuts or round up to whole slabs.

Fabrication and installation

A loaded rate is pay plus payroll taxes and benefits. Put templating and travel time in install hours.

Edges and cutouts

Enter only edge and cutout costs not already in your shop or install hours, other material, or overhead. If your hours already cover this work, leave both costs at 0. Leave out overhead already built into these rates.

Overhead

Overhead per sq ft: $20.00. It is applied to this job's 45 sq ft. Count each cost once: leave out overhead already built into your hourly or unit rates.

%

Your own goal. Margin = profit ÷ price.

Add the price you charge now to see the margin it gives.

What to Charge per Sq Ft

Price per sq ft$165.0040% margin

Dollars per sq ft

  • Material$44.24
  • Fabrication$17.11
  • Installation$8.00
  • Edges and cutouts$9.64
  • Overhead$20.00
  • Profit at target$66.00
Total Job Cost$4,454.91
Cost per Sq Ft$99.00
Markup on Cost66.7%

Price for a 40% Margin

$165.00 / sq ft
Job price (45 sq ft)$7,424.85
Profit on this job$2,969.94

Margin at $150.00 / sq ft

34.0%
Gap to target price$15.00 / sq ft below
Profit on this job at that price$2,295.09

6.0 percentage points below your target margin.

After the costs and overhead you entered, before income tax. Missing costs lower profit. Results shown use the example numbers.

Free CSV report. No email required.

Keep the Job and Its Numbers Together.

See how Stonify connects quoting, drawing and slab layout, scheduling, and job costing.

Get a Demo
Theme image
FAQ

A Clear Calculation. No Hidden Assumptions.

Have more questions? Don't hesitate to contact us:

info@stonify.io

01

How Is Each Number Calculated?

Material cost = job square feet ÷ (1 − waste) × (slab cost ÷ usable square feet per slab), plus other material and freight. It shares out the slab cost by area and waste. It does not plan a cutting layout or round your purchase up to whole slabs. Fabrication = shop hours × loaded shop rate. Installation = install hours × loaded install rate (templating and travel go in the hours). Edges and cutouts = edge linear feet × cost per linear foot, plus cutouts × cost per cutout. Enter only costs that are not already in your shop or install hours, other material, or overhead. If your hours already cover this work, leave both costs at zero. Leave out overhead already built into your hourly or unit rates. Overhead = monthly overhead ÷ square feet produced a month × the job’s square feet. Price per square foot = cost per square foot ÷ (1 − target margin). Totals use unrounded values. Displayed amounts may differ slightly when added together.

02

What Is the Difference Between Waste and Remnants?

03

What Should I Put in Overhead?

04

What Is the Difference Between Margin and Markup?

Theme image
FAQ

A Clear Calculation. No Hidden Assumptions.

Have more questions? Don't hesitate to contact us:

info@stonify.io

01

How Is Each Number Calculated?

Material cost = job square feet ÷ (1 − waste) × (slab cost ÷ usable square feet per slab), plus other material and freight. It shares out the slab cost by area and waste. It does not plan a cutting layout or round your purchase up to whole slabs. Fabrication = shop hours × loaded shop rate. Installation = install hours × loaded install rate (templating and travel go in the hours). Edges and cutouts = edge linear feet × cost per linear foot, plus cutouts × cost per cutout. Enter only costs that are not already in your shop or install hours, other material, or overhead. If your hours already cover this work, leave both costs at zero. Leave out overhead already built into your hourly or unit rates. Overhead = monthly overhead ÷ square feet produced a month × the job’s square feet. Price per square foot = cost per square foot ÷ (1 − target margin). Totals use unrounded values. Displayed amounts may differ slightly when added together.

02

What Is the Difference Between Waste and Remnants?

03

What Should I Put in Overhead?

04

What Is the Difference Between Margin and Markup?

Theme image
FAQ

A Clear Calculation. No Hidden Assumptions.

Have more questions? Don't hesitate to contact us:

info@stonify.io

01

How Is Each Number Calculated?

Material cost = job square feet ÷ (1 − waste) × (slab cost ÷ usable square feet per slab), plus other material and freight. It shares out the slab cost by area and waste. It does not plan a cutting layout or round your purchase up to whole slabs. Fabrication = shop hours × loaded shop rate. Installation = install hours × loaded install rate (templating and travel go in the hours). Edges and cutouts = edge linear feet × cost per linear foot, plus cutouts × cost per cutout. Enter only costs that are not already in your shop or install hours, other material, or overhead. If your hours already cover this work, leave both costs at zero. Leave out overhead already built into your hourly or unit rates. Overhead = monthly overhead ÷ square feet produced a month × the job’s square feet. Price per square foot = cost per square foot ÷ (1 − target margin). Totals use unrounded values. Displayed amounts may differ slightly when added together.

02

What Is the Difference Between Waste and Remnants?

03

What Should I Put in Overhead?

04

What Is the Difference Between Margin and Markup?