Free Tool for Stone Fabricators
Slab Yield and Waste Calculator
How much stone went into the finished job? Enter your starting slab area, installed square feet, and reusable remnants to see your yield and scrap.
Where the Stone Went
Example installed yield
72.7%80 of 110 sq ft went into the finished job.
- Installed stone
- 80 sq ft (72.7%)
- Reusable remnants
- 20 sq ft (18.2%)
- Scrap
- 10 sq ft (9.1%)
Installed yield is the installed area divided by the starting area. Scrap is what remains after subtracting installed stone and reusable remnants.