Track a customer-supplied sink by creating one intake record on the correct countertop project before the item enters shop storage. Record the manufacturer, model, dimensions, label, cutout source, condition, owner, receipt date, and exact storage location. Tag the physical sink with the project number. Keep its physical custody, cutout approval, fabrication release, and installation handoff as separate checks, and close the record only when installation or an authorized return is documented.

Treat Sink Identity, Cutout Approval, and Physical Custody as Three Checks

A model number identifies a product, but it does not prove which physical item is in the shop. A drawing approval confirms the opening the customer accepted, but it does not prove that the received sink matches that approval. A storage note says where an item should be, but it does not prove who moved it or whether it went on the correct truck.

Keep those facts connected without collapsing them into one generic “sink received” status. The shop should be able to answer three questions at any time: Which sink is this? Which approved cutout record applies? Where is the physical item now?

Use a Nine-Step Customer-Supplied Sink Intake Checklist

  • Match the delivery to the exact customer, project, room, and onsite contact before accepting it into job storage.

  • Record the manufacturer, complete model number, sink type, mounting method, bowl configuration, finish, and any customer or supplier reference.

  • Photograph the unopened package, product label, visible item, included accessories, and any damage. Record observations without deciding responsibility.

  • Save the manufacturer’s current specification sheet or cutout template and record where it came from and when it was checked.

  • Tag the physical sink and its package with the project number and a unique intake reference that remains readable after the package is opened.

  • Assign an exact storage location and record every handoff to templating, drafting, production, staging, or the installation crew.

  • Compare the received model and cutout source with the current drawing revision. Route any mismatch through the shop’s approval and change process before release.

  • Confirm production release separately: approved cutout, required physical sink or template, accessories, and responsible reviewer are present under the shop’s policy.

  • At dispatch and closeout, record whether the correct sink and accessories went to the site, were installed, remained with the customer, or were returned under an authorized decision.

Follow the sink manufacturer’s current installation instructions and the shop’s own technical standards. This checklist controls information and custody; it does not determine cutout dimensions, support requirements, plumbing scope, warranty coverage, or responsibility for damage.

Original Example: Two Similar Sinks for Two Jobs

This fictional example uses two boxed undermount sinks from the same brand. One belongs to Kitchen Job 241 and the other to Kitchen Job 248. The cartons look nearly identical, but the complete model numbers and bowl dimensions differ.

The receiver opens each project, photographs the shipping label and product label, records the full model, and applies a project tag to the carton. Job 241’s sink goes to rack position F-03; Job 248’s goes to F-04. The drafter compares each received model with the current drawing and manufacturer document before either cutout is released.

When Job 241 is staged, the production lead records that the approved cutout and the F-03 sink agree. The installer’s handoff lists the same model and intake reference. The final photo confirms the installed sink. The example illustrates a custody record, not a technical approval of either product.

Do Not Release a Cutout From a Photo or Text Message

A customer photo can help identify an item, but it may omit the model suffix, mounting details, or the document revision used by the manufacturer. A message saying “the sink is at the shop” can also remain visible after the sink was moved, exchanged, or returned. Release the affected work from the controlled project record, not from the newest message someone can find.

Use the sinks guide and cutouts guide for product and fabrication context. Use the production release checklist and current install-packet workflow for the adjacent office-to-shop and shop-to-field gates.

Test a Sink Custody Workflow Before You Buy Software

Ask a vendor to demonstrate two similar customer-supplied sinks for two active jobs. Receive both, attach label and condition photos, give them different storage locations, and link each one to a different approved drawing. Then change one sink model after templating and show how the affected approval and release state change without rewriting the other job.

Continue the test through dispatch. A production user should identify the current cutout record and physical item; an installer should see the current model, required accessories, and instructions; the office should receive completion evidence. Also test a damaged arrival, a customer pickup, and a sink that never reaches the shop.

Run the Sink-to-Install Test in Stonify

Stonify’s public quoting and estimating material describes a project record that keeps quoted, approved, invoiced, and paid status connected. Its drawing workflow supports cutouts as part of the drawing and quote, while Scheduling gives field users current job instructions and documents and returns photos, signatures, completion documents, and updates to the office.

That combination is relevant when sink identity and the approved opening currently live in different places. In a demo, ask Stonify to follow one real redacted sink intake from receipt photos and current drawing through production review and the installer view. Confirm the exact fields, permissions, and custody actions your shop would use; the public pages do not establish a dedicated warehouse module for customer-owned fixtures.

If your shop has found the wrong sink at the saw or on the truck, book a Stonify demo and bring one redacted incident. Ask to reproduce the chain from intake to installation without relying on a text thread or an unlabeled carton.

Ready to Run a Smarter Stone Operation?

Book a demo to see how Stonify can reduce costs at your shop.

Ready to Run a Smarter Stone Operation?

Book a demo to see how Stonify can reduce costs at your shop.